https://i0.wp.com/faberinfinite.com/wp-content/uploads/2022/05/106.-Faber-Infinite-Case-Study-Operational-Excellence-In-Tea-Manufacturing-Industry-1.jpg?fit=600%2C400&ssl=1

EQUIPMENT EFFECTIVENESS IMPROVEMENT

Based in Western India, client is a leading textile machine manufacturer, with reach across India region and a significant share of the Indian market. Major products are twisting machine, cabling machine etc. The client is also one of the leading suppliers to twisting machine in Exports. The key objective was to improve the availability time of all equipment of machine shop, OEE improvement via autonomous maintenance implementation.

  • Industry: Engineering
  • Region: APAC
  • Tools: Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE) improvement, Autonomous Maintenance(AM)
CONTACT DETAILSFaber Infinite
Excellence is a gradual result of always striving to do better.
OUR LOCATIONSWhere to find us?
https://i0.wp.com/faberinfinite.com/wp-content/uploads/2022/06/map-footer.png?fit=280%2C142&ssl=1
https://i0.wp.com/faberinfinite.com/wp-content/uploads/2019/04/img-footer-map.png?fit=280%2C142&ssl=1
GET IN TOUCHSocial links
Taking seamless key performance indicators offline to maximise the long tail.
CONTACT DETAILSFaber Infinite
OUR LOCATIONSWhere to find us?
https://i0.wp.com/faberinfinite.com/wp-content/uploads/2019/04/img-footer-map.png?fit=280%2C142&ssl=1
https://i0.wp.com/faberinfinite.com/wp-content/uploads/2022/06/map-footer.png?fit=280%2C142&ssl=1
OUR BRANCHESLocation
AHMEDABAD
VADODARA
PUNE
INDORE
BANGALORE
NAIROBI
LUSAKA
DUBAI
GET IN TOUCHSocial links
Taking seamless key performance indicators offline to maximise the long tail.

Copyright ©2022. All rights reserved. Web Design by Interactive Webstation.